Bridges

Load Restrictions on Township Bridges

Structural evaluations were performed on the following four (4) bridges in the Township of Armour in order to determine their load-carrying capacity:

No. Bridge Name Road/Water Course Type/Description
4 Pickerel and Jack Lake Road Bridge
Pickerel and Jack Lake Road
Single lane 9.7 m long single span concrete T-beam rigid frame bridge.

Structural Evaluation indicates that bridge can't safely support full Canadian Highway Bridge Design Code (CHBDC) traffic loads and that triple load posting of 29, 21 and 11 tonnes is required.
6 North Pickerel Lake Road Bridge
North Pickerel Lake Road
Single lane 10 m long single span concrete T-beam rigid frame bridge.

Structural Evaluation indicates that bridge can't safely support full Canadian Highway Bridge Design Code (CHBDC) traffic loads and that triple load posting of 29, 21 and 11 tonnes is required.
8 Horn Lake Road Bridge
Horn Lake Road
Single lane 18.45 m long three span concrete T-beam rigid frame bridge.

Structural Evaluation indicates that bridge can't safely support full Canadian Highway Bridge Design Code (CHBDC) traffic loads and that triple load posting of 22, 16 and 8 tonnes is required.
10 East Road Bridge East Road Single lane 18.2 m long three span concrete T-beam rigid frame bridge.

Structural Evaluation indicates that bridge can't safely support full Canadian Highway Bridge Design Code (CHBDC) traffic loads and that triple load posting of 23, 16 and 8 tonnes is required.